BGU PRESIDENT'S REPORT 2021
BGU PRESIDENT'S REPORT 2021
32
CAMPUS CONSTRUCTION
COMPLETED THIS YEAR • Lorry I. Lokey Chemistry Building • Electrical room on North Campus • Renovation of the ground floor of the Zlotowski Building for Electrical Engineering • Renovations of the Eric F. and Lore Ross Student Village (Daled dormitories) UNDER CONSTRUCTION • Undergraduate Village on the North Campus • Medical Simulation and Classroom Building, to house the Field Family Foundation Medical Simulation Center • The Cyndi and Max Mintzberg Ben Gurion Research Institute for the Study of Israel and Zionism Building and the Ben-Gurion Archives in Sde Boker • Renovation of the Gate of Aliya • Sylvan Adams Sports Centre expansion • North Campus utilities tunnels and underground infrastructure
Model apartment in the North Campus Undergraduate Village.
• Fira and Efim Guzik Plaza between the Lorry I. Lokey Chemistry Building and the Guzik Family Building for Biotechnology Engineering • Construction of research labs in the basement of the Guzik Family Building for Biotechnology Engineering
Made with FlippingBook - Online catalogs