PRESIDENT'S REPORT 2020 | OUR FIRST 50

BGU PRESIDENT'S REPORT 2020

10

CAMPUS CONSTRUCTION

COMPLETED THIS YEAR • Graduate Students Residence • Renovation of two buildings in the Zlotowski Dormitory Complex • Renovation of the central lobby of the Zlotowski Student Center • Renovation of classrooms in Building H2 at the Tuviyahu Campus UNDER CONSTRUCTION • Lorry I. Lokey Chemistry Building • Undergraduate Village on the North Campus • Medical Simulation and Classroom Building, to house the Field Family Foundation Simulation Center • The Cyndi and Max Mintzberg Ben-Gurion Research Institute for the Study of Israel and Zionism Building and the Cyndi and Max Mintzberg Ben-Gurion Archives Building • Electrical room on North Campus WORK TO BEGIN SOON • Sylvan Adams Sports Centre expansion • North Campus Energy Center • North Campus utilities tunnels and underground infrastructure • Renovation of the Gate of Aliya • BGU-Soroka Joint Research Building supported by the Adelis Foundation

UNDER DESIGN • Diane and Guilford Glazer Institute for Homeland Security Building • Drahi Innovation and Entrepreneurship Building • Computer Science Building • A new plaza between the Lorry I. Lokey Chemistry Building and the Guzik Family Building for Biotechnology Engineering • Adaptation of the Guzik Family Building for Biotechnology Engineering basement for research labs • Renovation of the Ilanot Gate FUTURE PROJECTS • Structural Engineering Building • University Art Gallery • Library for Engineering and Natural Sciences • Health Sciences research laboratories building • International Conference Center • Ernest Scheller, Jr. Gate of Innovation, North Campus

Made with FlippingBook Digital Publishing Software